ELEC-CAPACITE·Sector: chantiers·Pillar 3 — Infrastructure & Energy Sovereignty
Installed Power Generation Capacity
Current Value (2026)
678MW
↗ Progressing
Baseline (2024)
475MW
Initial reference pointPND Target 2030
1200MW
RELANCE 2026-2030Indicator Definition & Perimeter
Total grid-connected generating capacity in megawatts (all sources: thermal baseload, utility solar, hydro).
Associated PND Program: Program 4.2 — National Energy Sovereignty
Documented Historical Series
Related Infrastructure Projects
BKN-CH-0001Boulkiemdé (Centre-Ouest)
Under ConstructionKoudougou 30 MW Solar Power Plant
BKN-CH-0004Kourwéogo (Plateau-Central)
Under Construction